-+ 0.00%
-+ 0.00%
-+ 0.00%

SeaTwirl completes basic design for VERTI-GO's 2 MW floating offshore wind turbine

PUBT·11/18/2026 07:35:13
Listen to the news
SeaTwirl completes basic design for VERTI-GO's 2 MW floating offshore wind turbine
  • SeaTwirl completed the basic design for VERTI-GO's 2 MW floating offshore wind turbine, moving development into detailed design.
  • The design was submitted to CINEA on September 29, 2026; the agency has requested no corrections or additions.
  • A final construction investment decision requires technical review, a contracted grid-connected test site and remaining funding for construction and operation.
  • VERTI-GO runs from October 1, 2025, through 2029, with approximately EUR 15 million in EU funding; roughly half goes to SeaTwirl.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. SeaTwirl AB published the original content used to generate this news brief on November 18, 2026, and is solely responsible for the information contained therein.