-+ 0.00%
-+ 0.00%
-+ 0.00%

According to the Zhitong Finance App, Strait Co., Ltd. (002320.SZ) announced that the company plans to purchase a “Mingfa Hongyuan” deck cargo ship belonging to Hainan Yingfa Shipping Co., Ltd. and carry out adaptive modifications to operate the Haikou to Guangzhou Nansha route. The total investment of the project is no more than 150 million yuan, including all expenses such as purchase, taxes, submission for review, equipment, and renovation. The funding source is the company's own funds. After the purchase is completed, the company plans to add a multi-layer loading deck to the main deck and strengthen the hull structure, install roll-on springboards and inter-deck slope channels, and simultaneously implement modifications such as power expansion and photovoltaic systems, safety monitoring and fire extinguishing systems, ventilation and fire extinguishing systems, ventilation and fire pipelines, living cabins and environmental improvements. After the renovation, the design loading capacity is about 1,200 parking spaces, and apply for legal inspection and classification inspection in accordance with current regulations.

Zhitongcaijing·11/17/2026 13:33:19
Listen to the news
According to the Zhitong Finance App, Strait Co., Ltd. (002320.SZ) announced that the company plans to purchase a “Mingfa Hongyuan” deck cargo ship belonging to Hainan Yingfa Shipping Co., Ltd. and carry out adaptive modifications to operate the Haikou to Guangzhou Nansha route. The total investment of the project is no more than 150 million yuan, including all expenses such as purchase, taxes, submission for review, equipment, and renovation. The funding source is the company's own funds. After the purchase is completed, the company plans to add a multi-layer loading deck to the main deck and strengthen the hull structure, install roll-on springboards and inter-deck slope channels, and simultaneously implement modifications such as power expansion and photovoltaic systems, safety monitoring and fire extinguishing systems, ventilation and fire extinguishing systems, ventilation and fire pipelines, living cabins and environmental improvements. After the renovation, the design loading capacity is about 1,200 parking spaces, and apply for legal inspection and classification inspection in accordance with current regulations.