-+ 0.00%
-+ 0.00%
-+ 0.00%

Akobo Minerals produces approximately 12 kg of doré gold in October

PUBT·11/09/2026 06:31:00
Listen to the news
Akobo Minerals produces approximately 12 kg of doré gold in October
  • Akobo Minerals produced approximately 12 kg of doré gold in October 2026 at an average processed grade of 11 g/t.
  • Cumulative production reached approximately 181 kg since startup, with an average processed grade of approximately 22 g/t.
  • The lower October grade reflected more lower-grade development material from mine cross-drives, as well as previously accumulated tailings.
  • Processing stockpiles totaled approximately 1,100 tonnes, including approximately 800 tonnes of vertical shaft development material.
  • Gingibil drilling intersected the targeted quartz vein in late October and early November, with visible gold observed in both holes.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Akobo Minerals AB (publ) published the original content used to generate this news brief via Cision (Ref. ID: 202611090130BITN____UKPR__EN_20261108-BIT-6366-0) on November 09, 2026, and is solely responsible for the information contained therein.