-+ 0.00%
-+ 0.00%
-+ 0.00%

The CEO of the Nigerian National Petroleum Corporation said it is expected that one of Nigeria's smaller refineries will be in operation within a maximum of 36 months.

Zhitongcaijing·11/03/2026 13:17:16
Listen to the news
The CEO of the Nigerian National Petroleum Corporation said it is expected that one of Nigeria's smaller refineries will be in operation within a maximum of 36 months.