-+ 0.00%
-+ 0.00%
-+ 0.00%

Koryx Copper targets 260 MVA grid power supply for Haib project, backed by 68 km 220 kV link to NamPower network

PUBT·10/08/2026 11:04:26
Listen to the news
Koryx Copper targets 260 MVA grid power supply for Haib project, backed by 68 km 220 kV link to NamPower network
  • Koryx Copper outlined progress on the Haib copper project pre-feasibility study, targeting publication before end-November 2026.
  • Base-case processing shifts to milling and flotation only, dropping the heap-leach component from the main plan.
  • Debottlenecking lifted crushing capacity to 48 Mtpa; coarse particle flotation rejects 12 Mtpa, cutting main flotation throughput to 36 Mtpa.
  • Power plan centers on a 68 km, 220 kV grid link from Harib substation, backed by solar PV and battery storage.
  • Maximum demand estimated at 260 MVA; annual electricity use projected at 1.45 TWh as throughput rises.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Koryx Copper SA published the original content used to generate this news brief via Newsfile (Ref. ID: 202610080700NEWSFILECNPR____20261008_318073_1) on October 08, 2026, and is solely responsible for the information contained therein.