-+ 0.00%
-+ 0.00%
-+ 0.00%

Power Metallic appoints BBA to lead Nisk project preliminary economic assessment

PUBT·10/05/2026 07:00:35
Listen to the news
Power Metallic appoints BBA to lead Nisk project preliminary economic assessment
  • Power Metallic Mines appointed BBA to lead a preliminary economic assessment for the Lion and Nisk Main deposits at its Nisk Project.
  • Study to assess mining and processing options, infrastructure needs, capital and operating costs, project economics; completion targeted in H1 2027.
  • PEA design to use the Sept. 8, 2026 mineral resource estimate, centered on Lion; Nisk Main role under review pending SGS metallurgy.
  • Environmental baseline work runs alongside engineering, with a second field season planned for 2027; community engagement support awarded to ethos stratégie.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Power Metallic Mines Inc. published the original content used to generate this news brief via CNW (Ref. ID: 202610050300CANADANWCANADAPR_C6632) on October 05, 2026, and is solely responsible for the information contained therein.