-+ 0.00%
-+ 0.00%
-+ 0.00%

A2Gold drills 20.96 g/t AuEq over 1.5 meters at Taylor project in Nevada

PUBT·09/22/2026 11:30:54
Listen to the news
A2Gold drills 20.96 g/t AuEq over 1.5 meters at Taylor project in Nevada
  • A2 Gold reported initial RC drill results from the Taylor Silver-Gold Project in Nevada, flagging shallow, high-grade antimony-gold mineralization.
  • Hole TAR-008 hit 20.96 g/t AuEq over 1.5 m within 1.28 g/t AuEq over 36.6 m, about 170 m north of Merrimac.
  • Hole TAR-009 returned 4.09 g/t AuEq over 13.7 m, including 19.19 g/t AuEq over 1.5 m, in the same target area.
  • Silver drilling delivered 209.4 g/t over 10.7 m from surface in TAR-004; TAR-001 cut 52.6 g/t over 48.8 m.
  • Assays for 11 additional holes from the program remain pending.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. A2 Gold Corp. published the original content used to generate this news brief via CNW (Ref. ID: 202609220730CANADANWCANADAPR_C5608) on September 22, 2026, and is solely responsible for the information contained therein.