-+ 0.00%
-+ 0.00%
-+ 0.00%

Thelen unit Lamparter builds steel arch façades for Stuttgart main station project

PUBT·09/17/2026 14:10:27
Listen to the news
Thelen unit Lamparter builds steel arch façades for Stuttgart main station project
  • Thelen Holding’s subsidiary Lamparter won fabrication work for eight semi-circular façade arches at Stuttgart’s new main station.
  • Lamparter will produce steel structures near Kassel, linking the historic Bonatz building with the new through-station roof.
  • Each arch measures about 16 meters high, 10 meters wide, built from five segments; steel weight is about 11.5 tons.
  • Passenger access via the arches is scheduled to start from late 2027.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Thelen Holding GmbH published the original content used to generate this news brief on September 17, 2026, and is solely responsible for the information contained therein.