-+ 0.00%
-+ 0.00%
-+ 0.00%

Purepoint Uranium reports 1.65% U3O8 intercept at Dorado JV Nova target in winter drilling

PUBT·09/10/2026 10:32:00
Listen to the news
Purepoint Uranium reports 1.65% U3O8 intercept at Dorado JV Nova target in winter drilling
  • Purepoint reported winter 2026 drill assays from the Nova target at the 50/50 Dorado uranium joint venture with IsoEnergy.
  • Hole NV26-05 cut 1.65% U₃O₈ over 0.3 meters from 390.4 meters at the unconformity.
  • Hole NV26-03A returned 0.04% U₃O₈ over 3.9 meters from 412.6 meters, including 0.79% over 0.4 meters.
  • Nine-hole program intersected uranium in multiple holes across the Nova EM conductor, tightening structural interpretation for follow-up targeting.
  • Summer drilling has been completed, with results expected shortly.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Purepoint Uranium Group Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202609100630NEWSFILECNPR____20260910_313761_1) on September 10, 2026, and is solely responsible for the information contained therein.