-+ 0.00%
-+ 0.00%
-+ 0.00%

Talisker Reports Mustang Underground Face Sample Results Defining a 79-metre Strike Length High-grade Shoot Averaging 64.8 g/t on the 1030 Level

Barchart·09/09/2026 06:00:00
Listen to the news

TORONTO, Sept. 09, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQB:TSKFF) is pleased to report continued success from underground development on the 1030 Level at the Mustang Mine, where the Company has successfully developed on a continuous 79-metre strike length of high-grade gold mineralization along the BK Vein. The zone comprises a well-defined banded quartz vein averaging 64.84 grams per tonne (g/t) gold across an average true width of 0.50 metres. These encouraging results extend the high-grade ore shoot from the 1045 Level, reported on April 15, 2026, and provide further validation of Talisker's geological model, with continued demonstration of increasing grade and improved continuity of mineralized structures with depth within the Mustang Mine at the Bralorne Gold Project, British Columbia, Canada.

Read more at globenewswire.com

This article contains syndicated content. We have not reviewed, approved, or endorsed the content, and may receive compensation for placement of the content on this site. For more information please view the Barchart Disclosure Policy here.