-+ 0.00%
-+ 0.00%
-+ 0.00%

Lahontan Gold drills 10.7 m at 1.81 g/t gold, 64.8 g/t silver at Santa Fe stockpile project

PUBT·09/01/2026 11:02:27
Listen to the news
Lahontan Gold drills 10.7 m at 1.81 g/t gold, 64.8 g/t silver at Santa Fe stockpile project
  • Lahontan Gold reported 2026 Sonic drilling results from a historic “low-grade” stockpile at its Santa Fe Mine Project.
  • Nine vertical holes averaged 1.96 g/t gold equivalent, including 1.64 g/t gold and 36.2 g/t silver.
  • Top intercept measured 10.7 meters grading 1.81 g/t gold and 64.8 g/t silver.
  • Results support potential low-cost reprocessing via crushing and heap leaching using readily accessible, previously mined material.
  • CN-extractable gold ranged 5% to 93% of fire-assay values, averaging 43%; drilling continues across four historic heap leach pads.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Lahontan Gold Corp. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202609010700PRIMZONEFULLFEED9819209) on September 01, 2026, and is solely responsible for the information contained therein.