-+ 0.00%
-+ 0.00%
-+ 0.00%

According to the construction research and design announcement, the consortium formed by China Metallurgical Group Co., Ltd. and China Metallurgical Chengdu General Survey and Research Institute Co., Ltd. won the bid for the “BYD Aegean Shopping Center and High-end Residential Engineering General Contract” project, with a bid price of 2,991 billion yuan, of which the survey and design fee was 83.6392 million yuan. The project survey and design period was 180 calendar days, and the construction period was 1080 calendar days. A formal contract has not been signed for this project. If successfully implemented, it will have a positive effect on the company's future business performance.

Zhitongcaijing·09/01/2026 11:01:17
Listen to the news
According to the construction research and design announcement, the consortium formed by China Metallurgical Group Co., Ltd. and China Metallurgical Chengdu General Survey and Research Institute Co., Ltd. won the bid for the “BYD Aegean Shopping Center and High-end Residential Engineering General Contract” project, with a bid price of 2,991 billion yuan, of which the survey and design fee was 83.6392 million yuan. The project survey and design period was 180 calendar days, and the construction period was 1080 calendar days. A formal contract has not been signed for this project. If successfully implemented, it will have a positive effect on the company's future business performance.