-+ 0.00%
-+ 0.00%
-+ 0.00%

According to Juli Rigging, recently, China's self-developed S4000 floating wind power generation system successfully completed flight verification of the entire process of lift-off, airborne installation, power generation testing, and smooth recovery at a test site in northwest China. For the first time in the world, the floating wind power system was sent to an altitude of 4,000 meters above sea level and successfully generated electricity. Juli Rigging provides it with a tether cable and retractable system.

Zhitongcaijing·08/26/2026 03:33:05
Listen to the news
According to Juli Rigging, recently, China's self-developed S4000 floating wind power generation system successfully completed flight verification of the entire process of lift-off, airborne installation, power generation testing, and smooth recovery at a test site in northwest China. For the first time in the world, the floating wind power system was sent to an altitude of 4,000 meters above sea level and successfully generated electricity. Juli Rigging provides it with a tether cable and retractable system.