-+ 0.00%
-+ 0.00%
-+ 0.00%

Collective Mining reports 95% gold recovery at Apollo project in Colombia

PUBT·08/25/2026 10:30:25
Listen to the news
Collective Mining reports 95% gold recovery at Apollo project in Colombia
  • Collective Mining reported metallurgical testwork at its Apollo system in Colombia, showing conventional processing recoveries of 95% gold, 92% silver, 85% copper.
  • Testing on tungsten-bearing scheelite returned recoveries up to 74%, producing concentrates above 60% tungsten; bulk tests reached 95% scheelite purity.
  • Some tests showed more than 50% of gold could be recovered via gravity concentration, supporting potential flowsheet optimization.
  • Preliminary work on Apollo’s deeper Ramp Zone recovered up to 96% gold using conventional methods; full results targeted for H1-2027.
  • The maiden mineral resource estimate for Apollo is now targeted for September 2026 as licensing work is accelerated.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Collective Mining Ltd. published the original content used to generate this news brief via CNW (Ref. ID: 202608250630CANADANWCANADAPR_C2165) on August 25, 2026, and is solely responsible for the information contained therein.