-+ 0.00%
-+ 0.00%
-+ 0.00%

Mercado Minerals flags Phase II drill plan at Copalito project in Mexico after completing 25-hole program

PUBT·08/19/2026 11:32:14
Listen to the news
Mercado Minerals flags Phase II drill plan at Copalito project in Mexico after completing 25-hole program
  • Mercado Minerals completed a 25-hole inaugural diamond drill program at its Copalito project in Sinaloa, Mexico.
  • Drilling expanded mineralization across key veins, lifting cumulative mapped strike length to 11 km from 8 km.
  • Top intercept at El Agua: 3.5 m grading 686 g/t silver equivalent from 124.75 m, including 1.2 m at 1,120 g/t.
  • Best step-outs at El Pilar: 3.4 m at 403 g/t silver equivalent; 4.05 m at 264 g/t, supporting a higher-grade zone.
  • Surface work identified the new 1,150 m Renata vein; Phase II plans include first-pass drilling there, plus step-outs at El Agua and El Pilar.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Mercado Minerals Ltd. published the original content used to generate this news brief via Newsfile (Ref. ID: 202608190730NEWSFILECNPR____20260819_310382_1) on August 19, 2026, and is solely responsible for the information contained therein.