-+ 0.00%
-+ 0.00%
-+ 0.00%

At 11:00 on August 5, the Tianshengqiao Level 2 Hydropower Station opened for the first time during the 2026 flood season. The maximum flood discharge rate reached 250 cubic meters per second on that day, and the total outbound flow remained at 1,050 cubic meters per second.

Zhitongcaijing·08/05/2026 14:57:04
Listen to the news
At 11:00 on August 5, the Tianshengqiao Level 2 Hydropower Station opened for the first time during the 2026 flood season. The maximum flood discharge rate reached 250 cubic meters per second on that day, and the total outbound flow remained at 1,050 cubic meters per second.