-+ 0.00%
-+ 0.00%
-+ 0.00%

After the Abu Dhabi National Petroleum Company deployed the new technology, the number of drilling rigs that engineers could oversee increased by up to two times, and helped reduce downtime of up to two days.

Zhitongcaijing·08/04/2026 07:57:07
Listen to the news
After the Abu Dhabi National Petroleum Company deployed the new technology, the number of drilling rigs that engineers could oversee increased by up to two times, and helped reduce downtime of up to two days.