-+ 0.00%
-+ 0.00%
-+ 0.00%

Spanish Mountain Gold Company expanded the scope of mineralization in the feasibility study drilling project. The thickness of the ore reached 252.3 meters, and the gold grade was 0.82 grams per ton, which included a section of mineralized with a thickness of 93.5 meters and a gold grade of 1.32 grams per ton.

Zhitongcaijing·07/27/2026 11:33:30
Listen to the news
Spanish Mountain Gold Company expanded the scope of mineralization in the feasibility study drilling project. The thickness of the ore reached 252.3 meters, and the gold grade was 0.82 grams per ton, which included a section of mineralized with a thickness of 93.5 meters and a gold grade of 1.32 grams per ton.