-+ 0.00%
-+ 0.00%
-+ 0.00%

According to UAE media reports on the 22nd, against the backdrop of continued regional tension and the blockage of shipping in the Strait of Hormuz, the UAE is speeding up the construction of a new port project located in the Emirate of Fujairah on the east coast to reduce dependence on the Strait of Hormuz and enhance the country's container throughput capacity and level of maritime trade. According to reports, Dubai Global Ports Group signed a 50-year port franchise agreement with the Fujairah Port Authority on the same day to advance the construction of the Rugherat container port and the Diba-Fujairah port project. Fujairah is located on the east coast of the UAE, bordering the Gulf of Oman. Ships can enter and exit the Indian Ocean without passing through the Strait of Hormuz. According to the plan, the Rugelat container port is designed to have an annual processing capacity of 2.5 million TEUs. After completion, the Diba-Fujairah port project will add 3.6 million tons of general cargo handling capacity per year. The project will be implemented in stages, with an estimated construction period of 24 to 30 months.

Zhitongcaijing·07/23/2026 05:01:16
Listen to the news
According to UAE media reports on the 22nd, against the backdrop of continued regional tension and the blockage of shipping in the Strait of Hormuz, the UAE is speeding up the construction of a new port project located in the Emirate of Fujairah on the east coast to reduce dependence on the Strait of Hormuz and enhance the country's container throughput capacity and level of maritime trade. According to reports, Dubai Global Ports Group signed a 50-year port franchise agreement with the Fujairah Port Authority on the same day to advance the construction of the Rugherat container port and the Diba-Fujairah port project. Fujairah is located on the east coast of the UAE, bordering the Gulf of Oman. Ships can enter and exit the Indian Ocean without passing through the Strait of Hormuz. According to the plan, the Rugelat container port is designed to have an annual processing capacity of 2.5 million TEUs. After completion, the Diba-Fujairah port project will add 3.6 million tons of general cargo handling capacity per year. The project will be implemented in stages, with an estimated construction period of 24 to 30 months.