-+ 0.00%
-+ 0.00%
-+ 0.00%

Silver X expands Red Silver underground drill program to 6,650 meters after high-grade channel sampling

PUBT·07/22/2026 11:35:31
Listen to the news
Silver X expands Red Silver underground drill program to 6,650 meters after high-grade channel sampling
  • Silver X expanded its underground diamond drill program at the Red Silver Project in Peru to 6,650 meters from 1,200 meters.
  • Program targets resource growth at the María Luz sector, aiming to upgrade parts of the Inferred resource to Measured and Indicated.
  • Expansion follows underground channel sampling on the Silvia vein showing 735 g/t silver over 65 meters, including 649 g/t over 40 meters.
  • Red Silver hosts an NI 43-101 resource of 1,908,725 tonnes Inferred plus 41,600 tonnes Measured and Indicated, reported in May 2025.
  • Drilling uses existing underground workings; site sits about 8 km from the Nueva Recuperada processing plant.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Silver X Mining Corp. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202607220735ACCESSWRNAPR_____1194432) on July 22, 2026, and is solely responsible for the information contained therein.