-+ 0.00%
-+ 0.00%
-+ 0.00%

Allied Critical Metals hits 23.8 meters of 0.68% WO3 in first 2026 Santa Helena drill hole at Borralha project in Portugal

PUBT·07/16/2026 07:31:35
Listen to the news
Allied Critical Metals hits 23.8 meters of 0.68% WO3 in first 2026 Santa Helena drill hole at Borralha project in Portugal
  • Allied Critical Metals reported first 2026 drill assays from Santa Helena at Portugal’s Borralha tungsten project, supporting its PEA development case.
  • Hole Bo_13/26 hit 23.8 meters at 0.68% WO3 from 24.0 meters, including 4.0 meters at 2.96% WO3 from 44.0 meters.
  • A broader interval returned 57.6 meters at 0.30% WO3 from 24.0 meters, within 81.5 meters at 0.22% WO3.
  • A 20,000-meter drilling campaign is accelerating with six rigs active, with a seventh expected shortly.
  • Parallel drilling continues at the newly discovered Venise Breccia, targeting tungsten-molybdenum mineralization outside the current resource and PEA.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Allied Critical Metals Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202607160330NEWSFILECNPR____20260716_305371_1) on July 16, 2026, and is solely responsible for the information contained therein.