-+ 0.00%
-+ 0.00%
-+ 0.00%

Penghui Energy said in an agency conference call on July 15 that demand for the company's energy storage products was strong in the second half of this year, and production capacity was basically saturated. The company's newly built production line will be compatible with the production of mainstream battery products such as 314Ah and 588Ah, and is expected to be put into operation in the fourth quarter or the end of the year.

Zhitongcaijing·07/16/2026 00:09:01
Listen to the news
Penghui Energy said in an agency conference call on July 15 that demand for the company's energy storage products was strong in the second half of this year, and production capacity was basically saturated. The company's newly built production line will be compatible with the production of mainstream battery products such as 314Ah and 588Ah, and is expected to be put into operation in the fourth quarter or the end of the year.