-+ 0.00%
-+ 0.00%
-+ 0.00%

The reporter just learned from the Beijing Water Authority that, according to this year's weather forecast and hydrological analysis and judgment, the Beijing Municipal Government Reservoir Management Office deployed ahead of schedule to start pre-draining the reservoir on May 27 on the basis of falling below the flood limit level, to reserve sufficient storage space for subsequent intake of incoming water. After considering downstream river conditions in an integrated manner, the pre-discharge flow rate was 84.9 cubic meters per second. As of 8 o'clock on July 11, the reservoir had reserved an additional 170 million cubic meters of storage capacity below the flood limit to cope with subsequent heavy rainfall and ensure downstream safety.

Zhitongcaijing·07/11/2026 05:33:00
Listen to the news
The reporter just learned from the Beijing Water Authority that, according to this year's weather forecast and hydrological analysis and judgment, the Beijing Municipal Government Reservoir Management Office deployed ahead of schedule to start pre-draining the reservoir on May 27 on the basis of falling below the flood limit level, to reserve sufficient storage space for subsequent intake of incoming water. After considering downstream river conditions in an integrated manner, the pre-discharge flow rate was 84.9 cubic meters per second. As of 8 o'clock on July 11, the reservoir had reserved an additional 170 million cubic meters of storage capacity below the flood limit to cope with subsequent heavy rainfall and ensure downstream safety.