-+ 0.00%
-+ 0.00%
-+ 0.00%

CGN Power (01816)'s total commercial feed-in electricity volume in the first half of the year was about 109.597 billion kilowatt-hours, down 3.32% year on year

Zhitongcaijing·07/10/2026 09:17:05
Listen to the news

According to the Zhitong Finance App, CGN Power (01816) announced that from January to June 2026, the total power generation capacity of nuclear power units operated and managed by the group was about 117.766 billion kilowatt-hours, down 2.12% from the same period last year. Total commercial feed-in electricity capacity was approximately 109.597 billion kilowatt-hours, down 3.32% from the same period last year.

On April 19, 2026, Huizhou Unit 1 was put into commercial operation. On April 29, 2026, Cangnan Unit 1 was put into commercial operation. In the second quarter of 2026, the Group completed 3 annual material replacement overhauls and 2 10-year overhauls as planned. As of June 30, 2026, the Group has completed 7 annual material replacement overhauls (including 1 annual New Year's Eve overhaul) and 4 10-year overhauls as planned. In the third quarter of 2026, the Group plans to carry out 3 new annual material replacement overhauls and 2 10-year overhauls.

As of June 30, 2026, the Group managed a total of 18 nuclear power units under construction, all from the company's subsidiaries. 3 units are in the commissioning stage, 2 are in the equipment installation stage, 7 are in the civil construction stage, and 6 are in the FCD preparation stage.