-+ 0.00%
-+ 0.00%
-+ 0.00%

Turbo Energy, HiTHIUM deploy 366 MWh AI-driven energy storage across 15 European industrial sites

PUBT·06/24/2026 14:05:37
Listen to the news
Turbo Energy, HiTHIUM deploy 366 MWh AI-driven energy storage across 15 European industrial sites
  • Turbo Energy partnered with HiTHIUM to deploy AI-optimized battery storage across 15 industrial sites at a European electro-intensive ceramics group.
  • Project targets 366 MWh of battery energy storage capacity; more than 130 MWh has been installed.
  • Deployment integrates Turbo Energy’s AI optimization platform with HiTHIUM storage systems to manage generation, storage, consumption in real time.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Turbo Energy SA published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202606241005PRIMZONEFULLFEED9751922) on June 24, 2026, and is solely responsible for the information contained therein.