-+ 0.00%
-+ 0.00%
-+ 0.00%

At around 17:10 on December 14, there was a sudden equipment failure on the outbound line between the Beijing-Tianjin Intercity between Wuqing and Tianjin. As a result, some trains passing through this section were delayed. The railway department made every effort to make emergency repairs. Currently, the equipment fault has been eliminated, and the train operation order is gradually being restored. The railway department apologizes for the inconvenience caused to travelers. All travelers and friends are requested to pay timely attention to the information on the China Railway 12306 website or station announcements to make proper travel arrangements.

Zhitongcaijing·12/14/2025 10:25:00
Listen to the news
At around 17:10 on December 14, there was a sudden equipment failure on the outbound line between the Beijing-Tianjin Intercity between Wuqing and Tianjin. As a result, some trains passing through this section were delayed. The railway department made every effort to make emergency repairs. Currently, the equipment fault has been eliminated, and the train operation order is gradually being restored. The railway department apologizes for the inconvenience caused to travelers. All travelers and friends are requested to pay timely attention to the information on the China Railway 12306 website or station announcements to make proper travel arrangements.