-+ 0.00%
-+ 0.00%
-+ 0.00%

Jiufengshan Laboratory released the latest results of gallium nitride power modules. One million of these modules are installed in a very large AI computing power center cabinet with a capacity of 1 gigawatt, which can save nearly 300 million kilowatts of electricity per year, or about 240 million yuan in electricity costs. Team leader Dr. Li Sichao said that the result has now completed concept verification and is about to begin testing. It is expected to be mass-produced within 3-5 years, and can meet the needs of the 100 billion market at that time.

Zhitongcaijing·12/04/2025 03:25:02
Listen to the news
Jiufengshan Laboratory released the latest results of gallium nitride power modules. One million of these modules are installed in a very large AI computing power center cabinet with a capacity of 1 gigawatt, which can save nearly 300 million kilowatts of electricity per year, or about 240 million yuan in electricity costs. Team leader Dr. Li Sichao said that the result has now completed concept verification and is about to begin testing. It is expected to be mass-produced within 3-5 years, and can meet the needs of the 100 billion market at that time.