-+ 0.00%
-+ 0.00%
-+ 0.00%

The National Development and Reform Commission is seeking public comments on the “Regulations of the People's Republic of China on Satellite Navigation”. The period for seeking comments this time is from April 3, 2025 to May 2, 2025. The opinion draft mentions that the Beidou satellite navigation system is a satellite navigation system built and operated by China and is an important national space infrastructure; the satellite navigation enhancement system is a space-based or land-based system used to improve the accuracy, integrity, continuity, and usability of satellite navigation services. In order to promote China's Beidou satellite navigation system, enhance the continuous development of system science, and ensure its safe and stable operation, the draft for solicitation of comments clarifies the system construction requirements, stipulates that the system construction conforms to construction plans and policies, carries out procedures such as approval, approval or filing, and meets relevant requirements for radio management, network security, etc.; clarifies the requirements for stable operation of the system, publishes system operation information, and carries out monitoring and evaluation.

Zhitongcaijing·04/03/2025 10:09:10
Listen to the news
The National Development and Reform Commission is seeking public comments on the “Regulations of the People's Republic of China on Satellite Navigation”. The period for seeking comments this time is from April 3, 2025 to May 2, 2025. The opinion draft mentions that the Beidou satellite navigation system is a satellite navigation system built and operated by China and is an important national space infrastructure; the satellite navigation enhancement system is a space-based or land-based system used to improve the accuracy, integrity, continuity, and usability of satellite navigation services. In order to promote China's Beidou satellite navigation system, enhance the continuous development of system science, and ensure its safe and stable operation, the draft for solicitation of comments clarifies the system construction requirements, stipulates that the system construction conforms to construction plans and policies, carries out procedures such as approval, approval or filing, and meets relevant requirements for radio management, network security, etc.; clarifies the requirements for stable operation of the system, publishes system operation information, and carries out monitoring and evaluation.