-+ 0.00%
-+ 0.00%
-+ 0.00%

Bulgold evaluates unfunded drill test at Slovakia’s Lutila gold project

PUBT·10/29/2026 11:01:22
語音播報
Bulgold evaluates unfunded drill test at Slovakia’s Lutila gold project
  • Bulgold is evaluating proposed drilling at its 100%-owned Lutila gold project in central Slovakia; the program remains unfunded and unscheduled.
  • The proposed scissor-hole test would target quartz veins at Kopernica from two orientations to assess gold-silver mineralization at depth.
  • Exploration has outlined a 1.7-kilometer-by-0.8-kilometer hydrothermal system; a surface sample returned 21.2 grams per metric ton gold and 9.6 grams silver.
  • The project remains at the pre-discovery stage, with the targeted high-grade vein system yet to be discovered.
  • Exploration plans will be presented at the Munich Mining Conference on November 6-7, 2026.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Bulgold Inc. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202610290700ACCESSWRNAPR_____1243276) on October 29, 2026, and is solely responsible for the information contained therein.