-+ 0.00%
-+ 0.00%
-+ 0.00%

Naturgy-backed BlueNewables starts testing 1 MW floating solar demonstrator at Port of Valencia

PUBT·10/01/2026 13:42:06
語音播報
Naturgy-backed BlueNewables starts testing 1 MW floating solar demonstrator at Port of Valencia
  • Naturgy-backed BlueNewables completed installation of a 1 MW pre-commercial marine floating solar demonstrator in the Port of Valencia.
  • The project comprises two 500 kW PV-bos platforms, now entering a testing and monitoring phase in live port conditions.
  • Trials target performance, operations, maintenance, grid injection, integration in port areas to support potential scale-up decisions.
  • Naturgy, BlueNewables set a two-year technical and economic data-sharing collaboration covering test results, incidents, costs, operational learnings.
  • The demonstrator sits within RENMARINAS VALENCIAPORT, an IDAE-funded EU NextGenerationEU program for marine renewables test infrastructure.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Naturgy Energy Group SA published the original content used to generate this news brief on October 01, 2026, and is solely responsible for the information contained therein.