-+ 0.00%
-+ 0.00%
-+ 0.00%

We learned from the Xi'an Bureau of China Railway that on August 20, as the 55301 test operation train left Xi'an-East Railway Station, it marked that the Xi'an-Ankang high-speed railway officially entered the trial operation phase according to the chart. The Xikang High Speed Rail is an important part of the national medium- and long-term railway network planning for the Baohai Corridor and the Beijing-Kunming Corridor in the “eight vertical and eight horizontal” high-speed rail corridors. The total length of the new front line is about 171 kilometers, and the design speed is 350 kilometers per hour.

智通財經·08/20/2026 02:49:05
語音播報
We learned from the Xi'an Bureau of China Railway that on August 20, as the 55301 test operation train left Xi'an-East Railway Station, it marked that the Xi'an-Ankang high-speed railway officially entered the trial operation phase according to the chart. The Xikang High Speed Rail is an important part of the national medium- and long-term railway network planning for the Baohai Corridor and the Beijing-Kunming Corridor in the “eight vertical and eight horizontal” high-speed rail corridors. The total length of the new front line is about 171 kilometers, and the design speed is 350 kilometers per hour.