-+ 0.00%
-+ 0.00%
-+ 0.00%

Currently, some sections of the Shaying River and the Hongru River have been overrun and overrun. It is expected that high water levels will continue to flood for a long time, and the pressure to defend the embankment is high. According to the “Huai River Flood Control and Drought Relief Emergency Plan” and the “Huai River Water Resources Commission Flood and Drought Disaster Prevention Emergency Plan”, after comprehensive investigation and judgment, the Huai River Defense General Administration and the Huai Commission are scheduled to upgrade the flood control emergency response of the Shaying River and Hongru River water systems, tributaries of Huaibei in Henan Province to level 2 and flood prevention emergency response to level II at 10:00 on August 14.

智通財經·08/14/2026 04:17:19
語音播報
Currently, some sections of the Shaying River and the Hongru River have been overrun and overrun. It is expected that high water levels will continue to flood for a long time, and the pressure to defend the embankment is high. According to the “Huai River Flood Control and Drought Relief Emergency Plan” and the “Huai River Water Resources Commission Flood and Drought Disaster Prevention Emergency Plan”, after comprehensive investigation and judgment, the Huai River Defense General Administration and the Huai Commission are scheduled to upgrade the flood control emergency response of the Shaying River and Hongru River water systems, tributaries of Huaibei in Henan Province to level 2 and flood prevention emergency response to level II at 10:00 on August 14.