-+ 0.00%
-+ 0.00%
-+ 0.00%

After the Abu Dhabi National Petroleum Company deployed the new technology, the number of drilling rigs that engineers could oversee increased by up to two times, and helped reduce downtime of up to two days.

智通財經·08/04/2026 07:57:07
語音播報
After the Abu Dhabi National Petroleum Company deployed the new technology, the number of drilling rigs that engineers could oversee increased by up to two times, and helped reduce downtime of up to two days.