-+ 0.00%
-+ 0.00%
-+ 0.00%

NexMetals drills 11.15 m at 7.65% CuEq at Selebi Main deposit in Botswana

PUBT·07/22/2026 11:06:38
語音播報
NexMetals drills 11.15 m at 7.65% CuEq at Selebi Main deposit in Botswana
  • NexMetals Mining reported new drill results from Selebi Main in Botswana, extending high-grade massive sulphides beyond the 2024 resource model.
  • Hole SMD-26-212-W1 cut 11.15 meters of massive sulphides grading 7.65% CuEq, including 3.1% copper, 2.21% nickel.
  • Results outlined a mineralized Flexure Zone trend exceeding 1 km in strike, with drill spacing of about 200–300 meters.
  • Borehole electromagnetic modeling indicated conductors continuing north of current drilling, supporting further expansion potential.
  • A 2026 mineral resource estimate remains scheduled for completion in the third quarter of 2026.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Nexmetals Mining Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202607220700NEWSFILECNPR____20260722_306004_1) on July 22, 2026, and is solely responsible for the information contained therein.