-+ 0.00%
-+ 0.00%
-+ 0.00%

The reporter learned from the National Energy Group that today, the last unit of the Sichuan Dadu River Jinchuan Hydropower Station was officially connected to the grid, marking that the Jinchuan Hydropower Station was officially put into operation at full capacity.

智通財經·06/20/2026 00:09:02
語音播報
The reporter learned from the National Energy Group that today, the last unit of the Sichuan Dadu River Jinchuan Hydropower Station was officially connected to the grid, marking that the Jinchuan Hydropower Station was officially put into operation at full capacity.