-+ 0.00%
-+ 0.00%
-+ 0.00%

Today, the G0711 Urumqi-Yuli Expressway, which took more than 5 years to build, was opened to traffic. As a major transportation channel connecting the north and south of Xinjiang, the opening of the Wuwei Expressway will greatly facilitate the movement of local personnel and smooth logistics. The Wuwei Expressway was able to “cut the curve and straighten” the distance in space, and the travel time was drastically shortened. It actually “turned a gap into a path”. Click on the video to watch the moment the traffic cleared.

智通財經·12/26/2025 04:09:03
語音播報
Today, the G0711 Urumqi-Yuli Expressway, which took more than 5 years to build, was opened to traffic. As a major transportation channel connecting the north and south of Xinjiang, the opening of the Wuwei Expressway will greatly facilitate the movement of local personnel and smooth logistics. The Wuwei Expressway was able to “cut the curve and straighten” the distance in space, and the travel time was drastically shortened. It actually “turned a gap into a path”. Click on the video to watch the moment the traffic cleared.