-+ 0.00%
-+ 0.00%
-+ 0.00%

The 2025 Internet Computing Conference was held in Chengdu, Sichuan from December 24 to 25, 2025. During the conference, the cross-domain system of the National Computing Power Internet Service Platform was officially released, marking that the “1+M+N” architecture system of the National Computing Power Internet has been initially verified. Based on 1 national computing power Internet service platform, comprehensive management interconnection platform system; M regional interconnection platforms to carry out computing power connectivity verification in core computing power agglomeration areas such as Beijing, Inner Mongolia, Shanghai, Jiangsu, Zhejiang, Anhui, Sichuan, Guizhou, Shaanxi, Gansu, Qinghai, Ningxia, Ningbo, etc.; N industry connectivity platforms, China Telecom, China Mobile, and China Unicom launched the construction of a computing power Internet test network covering the entire region and linking layers. In 2025, the Internet computing power test system will schedule a total of 20 million cards. At the same time as the conference, the National Computing Power Internet Sichuan Hub Service Node was launched.

智通財經·12/24/2025 09:01:03
語音播報
The 2025 Internet Computing Conference was held in Chengdu, Sichuan from December 24 to 25, 2025. During the conference, the cross-domain system of the National Computing Power Internet Service Platform was officially released, marking that the “1+M+N” architecture system of the National Computing Power Internet has been initially verified. Based on 1 national computing power Internet service platform, comprehensive management interconnection platform system; M regional interconnection platforms to carry out computing power connectivity verification in core computing power agglomeration areas such as Beijing, Inner Mongolia, Shanghai, Jiangsu, Zhejiang, Anhui, Sichuan, Guizhou, Shaanxi, Gansu, Qinghai, Ningxia, Ningbo, etc.; N industry connectivity platforms, China Telecom, China Mobile, and China Unicom launched the construction of a computing power Internet test network covering the entire region and linking layers. In 2025, the Internet computing power test system will schedule a total of 20 million cards. At the same time as the conference, the National Computing Power Internet Sichuan Hub Service Node was launched.