-+ 0.00%
-+ 0.00%
-+ 0.00%

Tectonic Metals intersects 5.61 g/t gold over 41.15 meters at Flat project’s Black Creek target

PUBT·11/02/2026 13:07:19
Diffusion vocale
Tectonic Metals intersects 5.61 g/t gold over 41.15 meters at Flat project’s Black Creek target
  • Tectonic Metals reported 2.86 g/t gold over 91.44 meters at Black Creek, its longest intercept at Alaska’s Flat Gold Project.
  • The interval included 5.61 g/t gold over 41.15 meters, containing a higher-grade section of 12.94 g/t over 13.72 meters.
  • Hole CMR26-159 extended drilling 100 meters south of the discovery hole; mineralization remains open at depth.
  • Follow-up drilling will test deeper extensions and continuity at Black Creek, where over 85% of the gold-in-soil anomaly remains untested.
  • Chicken Mountain’s maiden mineral resource estimate is targeted for Q1 2027, followed by a preliminary economic assessment in Q2.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Tectonic Metals Inc. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202611020800ACCESSWRNAPR_____1244995) on November 02, 2026, and is solely responsible for the information contained therein.