-+ 0.00%
-+ 0.00%
-+ 0.00%

Oroco drills 234.6 m at 0.52% CuEq at Santo Tomás copper project in Mexico

PUBT·10/08/2026 11:06:14
Diffusion vocale
Oroco drills 234.6 m at 0.52% CuEq at Santo Tomás copper project in Mexico
  • Oroco reported Phase 2 South Zone assays at Santo Tomás in Sinaloa, Mexico, led by hole S045: 234.6 m grading 0.52% CuEq.
  • Phase 2 has completed 50 holes totaling 15,263 m across the South and Pillar zones; South Zone resource drilling is finished.
  • Hole S046 returned 128 m at 0.48% CuEq from surface, with additional mineralized intercepts below the 2024 PEA pit shell.
  • Results support potential resource model expansion, while Pillar Zone drilling continues alongside geotechnical work for pre-feasibility planning.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Oroco Resource Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202610080700NEWSFILECNPR____20261008_318054_1) on October 08, 2026, and is solely responsible for the information contained therein.