-+ 0.00%
-+ 0.00%
-+ 0.00%

Loyalist Exploration hires trajectorE Engineering as owner’s engineer for Tully Gold project flowsheet work

PUBT·09/28/2026 12:17:02
Diffusion vocale
Loyalist Exploration hires trajectorE Engineering as owner’s engineer for Tully Gold project flowsheet work
  • Loyalist Exploration engaged trajectorE Engineering as owner’s engineer to develop a mining-to-doré process flowsheet for the Tully Gold Project.
  • J. Dean Thibault will serve as lead technical advisor, supporting flowsheet design to advance engineering work tied to the 2026 NI 43-101 resource.
  • Tully resource estimate: Indicated 1.62 million tonnes at 3.16 g/t gold for 164,000 ounces; Inferred 0.95 million tonnes at 2.03 g/t for 62,000 ounces.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Loyalist Exploration Limited published the original content used to generate this news brief via TheNewswire (Ref. ID: 202609280815TNWSWRCACNPR_____1BjjFj2Dj) on September 28, 2026, and is solely responsible for the information contained therein.