The Zhitong Finance App learned that on November 18, the official website of the National Energy Administration issued the “Guiding Opinions on Accelerating the Integrated Development of Watershed Water Scenery”. Among them, it was mentioned that the “water landscape +” will accelerate the cultivation of a new 100% renewable energy business format and model, and guide the complementary support of “water scenery+ green computing power”. The policy continues to accelerate the construction of water scenery. With the goals and direction of future economic and social development comprehensive green transformation and construction further clarified, construction of wind power, hydropower, photovoltaics, etc. will be further accelerated, and we are optimistic about high-quality landscape assets.
The opinion points out that by 2030, the construction of integrated water and landscape bases in the Yalong River, the upper reaches of the Jinsha River, the upper reaches of the Lancang River, and southeastern Tibet (Yucha) has made positive progress, forming a number of “water scenery +” new business models to promote local consumption of new energy sources nearby; by 2035, integrated water and landscape development will become an important method for high-quality upgrading and development of hydropower in China, and watershed hydropower resources will be developed more efficiently, optimized allocation, and higher value consumption and utilization, injecting strong green momentum into high-quality economic and social development.
The “Guiding Opinions” make it clear that, based on watershed hydropower bases, the planning and construction of a number of integrated watershed water and landscape bases, with a single integrated watershed water and landscape base driving the scale of new energy development in principle not less than 5 million kilowatts; relying on the resource endowment advantages of abundant hydroenergy resources and high compatibility of water and landscape resources in the southwest region, accelerate the construction of pioneering bases such as the Yalong River, the upper reaches of the Jinsha River, the upper reaches of the Lancang River, and southeast Tibet (Yuca), etc., to solidly promote the construction of pioneering bases such as the middle and lower reaches of the Brahmaputra River, the Dadu River, and the Jinsha River. Preparation of domain base planning.
In terms of project management, opinions encourage local authorities to optimize processes such as nuclear preparation plans and power grid access. For projects that rely on existing hydropower bundling to consume surrounding new energy, the new energy portion can be uniformly approved or filed as a whole; and establish reliable capacity compensation mechanisms in an orderly manner to include eligible integrated water, landscape and solar projects within the scope of capacity compensation.
Industry analysts believe that this move has solved the operational problem of “separate approval of hydropower, scenery, and unsynchronized progress”, and is a substantial benefit in improving development efficiency. The essence of watershed water and landscape integration is not a simple “superposition” of water, wind, and electricity, but rather uses the ability to regulate hydropower as a lever to improve the overall renewable energy development efficiency of the watershed. Take the Yalong River Basin, the first nationally planned demonstration base for integrated water and landscape, as an example. It is planned to have an installed capacity of 78 million kilowatts, with four project groups at the mouth of the two rivers, Yazhong, Jinguan, and Ertan, which are all scheduled to be completed by 2035.
At the same time, the long-term value revaluation brought about by the integration of water and landscape has become a consensus. Huatai Securities pointed out that the integrated development of the Yalong River's water landscape is expected to increase in long-term value, and the allocation value of hydropower assets will be further highlighted through steady cash flow and adjusted value.
In its annual strategy, China Merchants Securities summarized the short-term logic of hydropower as “the region is hydrated, and hydropower in major watersheds is still flexible in growth”. The mid-term logic falls on market-based restoration of electricity prices and the explicit adjustment value. It believes that the hydropower price repair channel is being opened, and that the adjustment value of hydropower and the price difference between rich and dry prices will be systematically priced for the first time.
In terms of new business formats, the “Guiding Opinions” suggest exploring the collaborative development of “water scenery+green hydroammonia alcohol” to promote the two-way empowerment of “water scenery+green industry”. In terms of “water scenery+green computing power”, opinions are clear, explore the resource potential of idle underground cavern clusters of already built hydropower plants, develop new models such as geological stability, constant temperature and humidity, and develop new models such as cave-style computing power modules and intelligent computing facilities; explore direct supply computing power facilities with new energy as the main power source, and vigorously develop “flexible computing power” adapted to the characteristics of water landscape output to guide computing power loads to actively avoid peaks and fill valleys, and build a new ecosystem of integrated source network load storage and calculation.
Analysts said that the above measures essentially position the computing power load as an adjustable resource, complementing the existing idea of “using load as the source” to directly connect green electricity. It is worth noting that the “15th Five-Year Plan” issued earlier also proposes the rational allocation of new energy storage in new energy bases as needed. It is estimated that the total supporting energy storage scale for water and landscape integration and other bases will reach 50 million to 60 million kilowatts, and the policy framework for “water wind and light storage” collaboration is being formed at an accelerated pace.
Furthermore, from the demand side, industry insiders said that the “15th Five-Year Plan” demand for electricity grew rigidly, computing power consumption expanded, and heating season load increased to jointly strengthen demand support for electricity assets. The collaborative development of water, wind, and solar power helps to build a solid foundation for electricity supply and guarantee electricity consumption with high-quality upgrades.
Guosheng Securities Research Report points out that the upward signal for electricity prices continues to strengthen, focusing on the sector's expectations for future profit recovery. There is a consensus expectation that the 2027 long-term electricity price increase compared to this year will gradually increase, and subsequent profit recovery is expected to drive value revaluation. Hydropower performance is relatively stable, and dividend value is prominent. Computing and telecommunication collaboration is expected to open up new growth space for green power companies, and they are optimistic about high-quality landscape assets.
Related concept stocks:
China Electric Power (02380): The core listing platform under the China Power Investment Corporation. Its business covers various types of power sources such as hydropower, wind power, and photovoltaics. The combined total electricity sales volume for the first three quarters was 95.6 million megawatt-hours, of which the electricity sales volume for hydropower generation was 18.29 million megawatt-hours, a sharp increase of 26.28% over the previous year. Incoming water restoration led to significant improvements in the basic hydropower sector; wind power and photovoltaic sales were 20.4 million and 21.14 million megawatt-hours respectively, and the installed scale of green electricity continued to expand.
Longyuan Electric Power (00916): The world's largest wind power operator, achieved revenue of 21,242 billion yuan in the first three quarters, including revenue of 17.486 billion yuan from the wind power division and 3,552 billion yuan, up 19.81% year on year; as of the end of September, the holding installed capacity was 48.432 million kilowatts, including 30.499 million kilowatts of wind power and 14.9871 million kilowatts of solar energy. The scale advantage of wind power greatly benefited the intensive development of landscape resources in the watershed.
Datang New Energy (01798): Datang Group's main new energy development force, with wind power as the core (about 88.9% of reported wind power revenue), and photovoltaics is rapidly expanding. A power generation capacity of 22.826,400 megawatt-hours was completed in the first three quarters, with photovoltaic power generation up 1.96% year-on-year. The installed structure continues to be optimized, which is expected to benefit from the new installed space brought about by the construction of a waterscape base in the Southwest Basin.