-+ 0.00%
-+ 0.00%
-+ 0.00%

Fugro wins East Anglia Two post-installation survey contract

Barchart·11/04/2026 04:06:04
语音播报
Fugro has secured a contract from Cadeler to carry out post-installation seabed surveys at the 960 MW East Anglia Two offshore wind farm in the...