-+ 0.00%
-+ 0.00%
-+ 0.00%

Ramp Metals corrects Rush drill results after calculation error

PUBT·10/29/2026 11:38:40
语音播报
Ramp Metals corrects Rush drill results after calculation error
  • Ramp Metals corrected assay grades published August 4, 2026, citing a calculation error.
  • Rush-019's 139–143-meter interval returned 1.68% copper equivalent, revised from 4.83%.
  • The broader Rush-019 interval at 123–151.23 meters was revised to 0.87% copper equivalent from 0.86%.
  • Rush-014's 284.3–287-meter interval was corrected to 1.71% copper equivalent from 2.77%.
  • Rush-016's 112.5–114.9-meter interval returned 2.24% copper equivalent, down from the previously reported 2.74%.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Ramp Metals Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202610290730NEWSFILECNPR____20261029_321497_1) on October 29, 2026, and is solely responsible for the information contained therein.