-+ 0.00%
-+ 0.00%
-+ 0.00%

Cambria Gold Mines Intersects 98.56 g/t Gold Over 8.2 Metres at Silver Coin Deposit

PUBT·10/18/2026 21:11:13
语音播报
Cambria Gold Mines Intersects 98.56 g/t Gold Over 8.2 Metres at Silver Coin Deposit
  • Cambria Gold Mines reported 98.56 g/t gold over 8.2 meters at the Silver Coin deposit within British Columbia’s Premier Gold Project.
  • The intersection included 794 g/t gold over 1 meter in drill hole SC26-2714.
  • Silver Coin is a priority for underground development in spring 2027 following high-grade drilling results.
  • Material from Silver Coin and Premier is expected to provide initial feed for the 2,500-tonne-per-day Premier Mill during its planned restart.
  • Results from over 14,000 meters of drilling will inform an updated mineral resource estimate and feasibility study targeted for first-half 2027 completion.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Cambria Gold Mines Inc. published the original content used to generate this news brief on October 18, 2026, and is solely responsible for the information contained therein.