-+ 0.00%
-+ 0.00%
-+ 0.00%

Green Bridge Metals hits 195 m at 0.25% Cu, 10.18% TiO2 in Minnesota Titac South drilling

PUBT·09/10/2026 11:53:46
语音播报
Green Bridge Metals hits 195 m at 0.25% Cu, 10.18% TiO2 in Minnesota Titac South drilling
  • Green Bridge Metals reported final Phase 1 drill assays from Titac South in Minnesota, supporting an accelerated Phase 2 program.
  • Hole TS26-004a cut 195 m grading 0.25% Cu and 10.18% TiO2, including 62 m at 0.29% Cu and 10.54% TiO2.
  • Step-out hole TS26-007 hit 12 m at 0.2% Cu, 8.33% TiO2, 0.15% V2O5 at a previously untested geophysical target.
  • Phase 2 drilling targets copper inclusion and resource expansion at Titac North, supporting a scoping study targeted by end-2027.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Green Bridge Metals Corporation published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202609100730ACCESSWRNAPR_____1219004) on September 10, 2026, and is solely responsible for the information contained therein.