-+ 0.00%
-+ 0.00%
-+ 0.00%

Orosur Mining begins first drilling at El Cedro prospect in Colombia’s Anza project

PUBT·09/02/2026 06:03:59
语音播报
Orosur Mining begins first drilling at El Cedro prospect in Colombia’s Anza project
  • Orosur Mining launched the first-ever drill program at the El Cedro gold-copper porphyry target at its Anzá project in Colombia.
  • Initial hole CED001 intersected porphyry with stockwork veining, silicification, potassic alteration; planned depth 500 m, roughly five weeks to complete.
  • Anzá land package expanded to about 530 km2, including 170 km2 granted titles, 360 km2 under application.
  • Pepas West drilling returned shallow oxidized gold intercepts including 19.45 m at 1.02 g/t Au from surface in PEP106.
  • APTA hole MAP108 cut 78.95 m at 0.38 g/t Au, supporting structural targeting for higher-grade zones in the epithermal system.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Orosur Mining Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202609020200NEWSFILECNPR____20260902_312424_1) on September 02, 2026, and is solely responsible for the information contained therein.