-+ 0.00%
-+ 0.00%
-+ 0.00%

VR Resources hits 317 m at 0.77% CuEq from surface at New Boston project in Nevada

PUBT·08/26/2026 11:03:35
语音播报
VR Resources hits 317 m at 0.77% CuEq from surface at New Boston project in Nevada
  • VR Resources reported drill results from New Boston porphyry-skarn project in Nevada, highlighting near-continuous polymetallic veining to 881 m.
  • Hole NB26-003 intersected 317 m at 0.77% CuEq from surface, indicating a shallow mineralized zone with moly-tungsten dominance.
  • A deeper interval returned 419 m at 0.48% CuEq from 460 m, including 31 m at 0.98% CuEq around a newly identified diorite porphyry.
  • A 2 m skarn interval at 535 m assayed 1.48% WO3, 0.32% Cu, 427 g/t Ag for 33.43% CuEq.
  • Mineralization remained open at depth; drilling stopped due to hole instability, with mineralized granite porphyry intersected near 858 m.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. VR Resources Ltd. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202608260700PRIMZONECNPR____9816300) on August 26, 2026, and is solely responsible for the information contained therein.