-+ 0.00%
-+ 0.00%
-+ 0.00%

Newcore Gold files NI 43-101 pre-feasibility study technical report for Enchi gold project in Ghana

PUBT·08/07/2026 21:06:44
语音播报
Newcore Gold files NI 43-101 pre-feasibility study technical report for Enchi gold project in Ghana
  • Newcore filed an NI 43-101 technical report supporting a pre-feasibility study for the Enchi Gold Project in Ghana, effective June 23, 2026.
  • Base case outlines a conventional open-pit operation with milling and carbon-in-leach processing at 5.5 million tonnes per annum using contract mining.
  • Study relies on a March 18, 2026 mineral resource estimate based on drilling through Oct. 6, 2025.
  • More than 50,000 meters of additional drilling is excluded; ongoing 80,000-meter program targets higher-grade depth extensions beyond current pit limits.
  • 2026 drilling results are slated for inclusion in future resource and reserve updates, with follow-on economic studies.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Newcore Gold Ltd. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 202608071706PRIMZONEFULLFEED9806269) on August 07, 2026, and is solely responsible for the information contained therein.