-+ 0.00%
-+ 0.00%
-+ 0.00%

Doubleview Gold advances 2026 drilling to Pad 2 at Hat project in British Columbia

PUBT·07/14/2026 09:16:07
语音播报
Doubleview Gold advances 2026 drilling to Pad 2 at Hat project in British Columbia
  • Doubleview Gold outlined its 2026 drill program at the 100%-owned Hat polymetallic porphyry project in northwestern British Columbia.
  • Pad 1 holes H109-H112 hit Hat-style mineralization at target depth; assays pending.
  • Drilling shifts to Pad 2 southwest of the deposit, targeting resource expansion.
  • Four priority pad locations were selected after geological work, a conditional-simulation confidence study, and AI analysis of IP geophysics converged on the same targets.
  • Hat hosts 609 Mt of Measured and Indicated resources at 0.43% CuEq, plus 503 Mt of Inferred at 0.41% CuEq.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Doubleview Gold Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202607140515NEWSFILECNPR____20260714_305098_1) on July 14, 2026, and is solely responsible for the information contained therein.