-+ 0.00%
-+ 0.00%
-+ 0.00%

Viking Mines starts Linka tungsten tailings, stockpile evaluation in Nevada

PUBT·04/14/2026 00:02:33
语音播报
Viking Mines starts Linka tungsten tailings, stockpile evaluation in Nevada
  • Viking Mines started fieldwork at Linka Tungsten Project in Nevada to quantify historical ore stockpiles and tailings for potential near-term, low-capex processing.
  • Sampling program targets about 52 tailings-dam samples to estimate WO3 grade, thickness, volume, then assess economics of reprocessing as supplemental feed for a modular plant.
  • Work also includes stockpile sampling to confirm grade consistency following prior 0.8% WO3 composite result, with tonnage estimate to support early processing options such as toll treatment.
  • Metallurgical program expanded with comminution testwork to define energy use and operating costs for a processing concept study, following earlier testwork that produced 63.6% WO3 concentrate from primary mineralization.
  • Phase 2 fieldwork scheduled for late April to finalize layouts for maiden drilling planned for June quarter, with APT tungsten price cited at US$3,185/mtu.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Viking Mines Limited published the original content used to generate this news brief on April 13, 2026, and is solely responsible for the information contained therein.